TPM Officer & Cost Control Leader

Company Name: PT SCHOTT Igar Glass

Location: Cikarang Pusat

Posted Date: 05/10/2024 09:38

Salary: Rp 7.000.000 – Rp 9.000.000 per month

Job Description

Your Profile:

  • University degree in an industrial engineering discipline
  • 2 years of experience in managing cost saving. Experience in Lean and project management and commitment to the Company Lean Approach.
  • Structured working style, communicative leadership style, assertiveness, moderation and presentation skills, distinctive social competence, open-mindness towards changes, excellent command of the English language (a second foreign language is highly appreciated), competence in process stabilization and optimization (i.e. Six-Sigma, PSO Black-Level)
  • Have a good knowledge on accounting cycle and system, IFRS and Local GAAP.
  • Good communication in English.
  • Able to analyze and problem solving (5 WHY analysis, RCA, fishbone, pareto, FMEA, PDCA & DMAIC)

Your Task:

  • In charge of TPM roadmap at the factory level

Facilitate TPM Audit:

prepare TPM audit schedule, database, controlling and moderating audit

  • Give advice and follow up the findings to improve the level of TPM implementation
  • Facilitate regular meeting with TPM pillars (to able to analyze the level of preparedness/achievement of each TPM pillars)
  • Provide the input to the team in implementing TPM, 5S and EHS for continuous improvement
  • Follow-up on improvement initiative related to TPM, 5S and EHS
  • Update regularly TPM progress to headquarters

labelling standard, repainting of floor, line marking, etc.)

  • Facilitating discussion or workshop related to continuous improvements in both administrative and technical areas.
  • Able to coordinate, facilitate program/audit of TPM, EHS and 5S and improvement task with the team
  • To discuss about improvement idea with Lean Expert
  • To escalate issue to higher level that cannot solve by team
  • Report TPM audit attendance and audit task completion rate
  • Responsible for the performance of 5S facilitator in the application of 5S in the company
  • To observe implemented project and potential project improvement that have a good impact.

Reporting line:

Dotted line report to Finance Director as cost saving program chairman.

Apply Here

0 Shares:
You May Also Like